First Energy Metals Ltd. (CSE: FE) has identified new target areas for our Phase 2 exploration trenching and drilling programme at its flagship Augustus Lithium Project in Canada through a Helicopter borne Magnetic Survey.
The high-resolution Magnetic Survey was conducted by Geo Data Solutions GDS Inc. of Laval, Quebec. In total, 661 line-kilometres were surveyed with traverse lines flown at N12.5 degrees East, perpendicular to the orientation of the local geological structural trend.
Survey flight lines were spaced 25 m apart with the area investigated beginning near to the North American Lithium mine and extending eight km westward to encompasses several important Lithium targets including Augustus and the Beluga on the First Energy claims.
The survey resulted in highlighting and identifying key geologic boundaries, faults and new, untested targets identified south and southeast of the main showings. The report by Geo Data Solutions, highlighted and recommended further work in a new untested area that is directly adjacent to and to the northwest of the main Augustus exploration target.
Their analysis and geophysical interpretation now outline a strike length of 1.8 km for Augustus, more than doubling the length historically documented.
For further information please visit: https://www.firstenergymetals.com/