Meeka Metals Limited (ASX:MEK) has obtained high-grade REE assays from the Circle Valley project in Western Australia.
The assays relate to 60 infill and extensional Mineral Resource drill holes completed during the March 2023 quarter. This drilling covers an area of ~10sq. km. A further 32 holes covering an additional ~5sq. km, are pending. Combined, these results will be used to inform a REE Mineral Resource for Circle Valley in the June 2023 quarter.
“Initial results from this programme confirm what was evident in the drilling completed during 2022, thick zones of high-grade mineralization rich in NdPr magnet rare earth elements,” Managing Director Tim Davidson, said.
“Additionally, this drilling significantly expands the footprint of mineralization in preparation for Mineral Resource estimation.
“While we are awaiting results from a further 32 infill and extensional drill holes, it is apparent the shallow high-grade mineralization trends northwest and remains open in that direction, providing potential for further growth through drilling.”
Highlights
- Assays received for 60 infill and extensional rare earth element (REE) Mineral Resource drill holes from Circle Valley (MEK 100%) covering an area of ~10sq. km.
- Individual samples returned TREO grades up to 3,084ppm with consistently high NdPr to TREO ratios, up to 34%.
- Composite high-grade intersections include:
o 6m @2,360ppm TREO (30% NdPr) from 46m incl. 4m @3,084ppm TREO (23CVAC044)
o 8m @1,542ppm TREO (27% NdPr) from 20m incl. 4m @1,843ppm TREO (23CVAC023)
o 4m @1,495ppm TREO (19% NdPr) from 35m (23CVAC038)
o 10m @1,364ppm TREO (28% NdPr) from 32m incl. 4m @1,805ppm TREO (23CVAC060)
o 12m @1,330ppm TREO (21% NdPr) from 12m incl. 4m @1,671ppm TREO (23CVAC010)
o 8m @1,258ppm TREO (30% NdPr) from 16m incl. 4m @1,998ppm TREO (23CVAC009)
o 4m @1,017ppm TREO (27% NdPr) from 27m (23CVAC029)
o 4m @1,005ppm TREO (30% NdPr) from 16m (23CVAC016)
- Assays for a further ~5sq. km of infill and extensional drilling are pending with results expected in the coming weeks.
- This drilling, over a total area of ~15sq. km, infilled and extended mineralization surrounding previous shallow high-grade REE results grading up to 6,894ppm TREO.
- The initial REE Mineral Resource for Circle Valley remains on track for the June 2023 quarter.
For further information please visit: https://meekametals.com.au/