Red Mountain Mining Limited (ASX: RMX) has intersected lithium in multiple holes in its Phase 1 Reverse Circulation (RC) maiden drilling completed at its wholly-owned Mustang Lithium Project in Nevada, USA.
Nevada based drilling company, Alloy Drilling LLC, was engaged to undertake the Mustang Phase 1 drilling program. Two extra drill holes were added to the initial eight hole programme to gain further insight into the Mustang geology.
From the 10 holes drilled, a majority encountered over 45m of lithium bearing claystone consistent with host geology.
The final batch of drilled claystones are currently being dried to meticulously avoid any cross contamination. Preparation of remainder samples are underway for delivery to American Assay Laboratories for comprehensive analysis.
The company has instructed fast-tracking of assay results and expects a turnaround time of three weeks.
For further information please visit: https://www.redmountainmining.com.au/