2500m RC Drilling Programme Expected To Complete In March
Tempest Minerals Ltd (ASX:TEM) has kicked off a drilling campaign at the Messenger Project in Western Australia.
The programme consists of approximately 2500m of RC drilling at both the existing Dally high grade lode hosted gold target and the Wally VMS target.
The Messenger Project is part of the company’s extensive landholding within the Yalgoo greenstone belt located 450 km North of Perth, Western Australia. The project is nearby the prolific Golden Grove Copper/Zinc/Gold Mine, recent high-grade drilling at the Emu Gnows Nest project.
Tempest recently announced an extension to the project and drilling programme historic high-grade Messengers Patch.
The new extension is a mining lease comprising 72 hectares along strike from the previously announced drilling and new exploration leases. Tempest has entered into an agreement with the holder of the M5900495 to earn in up to 50% of the tenement through expenditure of A$50,000 including drilling over the next 12 months.
The new extension covers the well-known historic high grade Messengers Patch gold production area.
The Messenger Project (including the new tenement) is a well-known historic mining area which had numerous high-grade mines (up to 10 ounces gold per ton) and a state battery (government built gold processing facility) in the early 1900s.