Visionary Gold Corp. (TSXV: VIZ) hit gold mineralised zones in each of the first five drill holes its Wolf Gold Project Fremont County, Wyoming.
The results cconfirm continuous gold mineralisation over 480 m of the 2.6-km shear zone.
“Intersecting gold values in each drillhole of the first-ever drill programme in the Lewiston District confirms the existence of a large gold-bearing hydrothermal system, supporting our exploration thesis,” CEO, Wes Adams, said.
“We know from extensive surface sampling and mapping that higher-grade zones of mineralisation exist within the Wolf Shear structure, but more drilling is needed to further define them.
“Additionally, we plan to drill-test three recently defined parallel mineralised structures that have been identified adjacent to the Wolf Shear Zone, as well as other new targets generated during a busy 2021 field programme.”
Drill results
The five holes drilled at the Wolf Gold Project in 2021 (WLF001-WLF005) totalled 780m. Gold mineralisation occurred in chlorite and limonite-stained fault breccias, veins and zones of intense fracturing within the shear corridor.
Interpreted mineralised corridors appear to be continuous over the full 480m; however, the widths and grades of mineralisation appear to be increasing slightly to the northeast along strike.
All drill holes in the 2021 programme were drilled from northwest to southeast across the interpreted strike of the Wolf Shear Zone; however, future drilling will also test cross cutting structures and shallowly, south-easterly dipping veins, which could have an influence on mineralisation.
For further information please visit: https://visionarygoldcorp.com/